HOME>Compay>PRH&C
 
   
 
Item PRH&C (Masang)  Japanese Brand
Method Pressurized Rapid Hot Water STEAM
Energy Control Recycle for hot water Steam Discard
Installation Fee Within USD 70,000
(Excluding Vacuum Equipment)
Around USD 300,000
(Excluding Vacuum Equipment)
Using Energy Electricity (HEATER  Use) Boiler (OIL Use)
Machinery Cost USD1,200/Mon (962kw/Day) USD 25,000/Mon  (Gasoline 1000ℓ ~1100ℓ /Day)
Cycle Time 82sec
(Heat: 41sec  Cooling:10sec)
85sec
(Heat: 38sec, Cooling:15sec)
Cooling Speed Turbulent Flow System General Cooling Method
Temp Variation ± 3℃ ± 15℃
(Temp Variation between  Entry and Exit Gate)
 
  Heat Source Energy Consumption (USD) Cooling Equipment/ Operational Expense Temp Variation Heat Time INJ Time Cool Time Cycle
Steam System Boiler (Steam) GAS :  $ 12,960/ Mon Disel : $22,000/Mon Capacity : 50HP 33,699KW/Mon = $ 1,590 8~15℃ 160℃ 33sec 18 sec 23 Sec 74 Sec
Disel /GAS
PRH&C Heater
(Warm Water)
$ 600 ~ 1,200 / Mon Capacity : 15HP 6,480KW/Mon =  $ 305 2~3 ℃ 180℃ 28sec 18 Sec 13 Sec 59 Sec
Electiricity